Angebotseröffnung-ITB 2025-487-MP Austausch der Hauptwasserleitung (WM) am Dade Blvd – Schwerkraftkanalisation und WM in der 19. Straße
September 29 @ 3:00 pm - 15:30 Uhr

By means of this ITB, the City is seeking an experienced and qualified firm to complete the replacement of the existing 20-inch Ductile Iron Pipe (DIP) water main along Dade Blvd. (between N Michigan Ave and 23rd St) and the replacement of the existing 20-inch DIP water main and the existing 8-inch gravity sewer pipe along 19th St.(between Alton Rd. and N Michigan Ave).
The scope also includes a design alternative to cover the full roadway restoration cost in lieu of area trench restoration along Dade Blvd from 17th Street to 23rd Street. The construction scope includes milling, resurfacing, and roadway base restoration.